design year: 2005
year of construction: 2006
architect: Miklós Salamin
architectural team: Tamás Parragi, Balázs Szlabey, Zsolt Korda, Attila Balogh
The Rubin Hotel was built in the 90s. During the current expansion of the building, a reception building was constructed on the Budaörsi street side, and the plans for a conference building on the area on the upper street side were completed. The existing parts of the building housed a wellness center, a bowling alley, a squash court, a restaurant and a session room.
So far, part of the plans have been completed, the reception building, the wellness center and the bowling and squash courts are already in operation.