location: Tihany, Visszhang hill
design: 2015-2018
construction: 2020-2021
client: Tihany Municipality
contractor: IM PRODUCT Kft.
lead architect: Varga Csaba
associate architect: Vavrik Ferenc
structural: Mantuano Tamás
mechanical engineer: Fenyves Tamás
electrical engineer: Levek István
budgeting: Bognár László
photos: Varga Csaba
The location is the lower part of the hill, right next to the existing parking/event space. The building consists of two parts. The part above the ground is the conversion of a small building formerly used as a public toilet into an information point and café. The other half is a new public toilet under the ground between this building and the retaining wall of the car park, which is accessible from Visszhang Street.